Georgia's topography and water resources make hydropower a natural choice. A hydropower plant is an infrastructure-grade asset: it operates for decades, is not exposed to fuel prices, and its operating costs are predictable.
In energy projects the decisive stage comes before construction — hydrological studies, environmental impact assessment, permitting and grid connection terms. That is where a project is won or lost.
A hydropower plant does not only produce energy. It creates jobs, improves local infrastructure and builds a long-term tax base for the community around it.
We meet investors and partners from the energy sector — get in touch.
11 villas on a Gonio hillside, each on its own 300 m² plot. A 120 m² villa from $144,000, 5 km from the sea.
A multi-unit residential project with contemporary architecture and complete infrastructure.
The hotel company within the InvestCorp Georgia group.